The wildflowers from last year have popped up all over the mounds of topsoil that was pushed aside!
The ceiling/upstairs floor beams were installed, leveled and plumbed by Dad and Carpenter Mike. They used a mechanics floor jack and scaffolding to get the beams right where they wanted.
Then the BCI joists were installed in the upstairs floor system. Mom set the brackets and Dad nailed in the joists. Mike did the cutting.